Wastewater Collection System Hydraulic Modeling and Master Plan

Montrose, CO

First, a GIS-based hydraulic model was developed based on the City’s sewer infrastructure database. The model was further calibrated based 11 flow-monitoring data. Then, the existing system was evaluated for the existing and future sewer loads. Finally, capital improvement projects were identified based on future development scenarios.

Bai Engineers worked as the sub-contractor to Farnsworth Group Inc. (FGI) to conduct a sewer collection hydraulic model for the City of Montrose (City). FGI was contracted by the City for Water and Wastewater Master Plan Project.

Completion Date: January 2016
Project Highlights
  • Sewer hydraulic model was built using InfoSWMM
  • Sewer model was calibrated based on field observed data
  • Existing and future system improvement projects were evaluated
Bai Engineers, LLC
Phone: (720) 474-0941
Email: xbai@bai-eng.com
Website: www.bai-eng.com
Main Office: 5350 DTC Pkwy, #206 Greenwood Village, CO 80111
DUNs#: 079586993
Cage Code: 78WY0
SBC Control ID: SBC_000857907
Copyright © 2014-2019 Bai Engineers, LLC, All Rights Reserved
  • Home
  • Who We Are
  • Our Projects
  • Learn From Us
  • Contact Us