Bai Engineers
  • Home
  • Who We Are
  • What We Do
  • Our Projects
  • Learn From Us
  • Contact Us

Fowler Water Treatment Pilot Testing

Fowler, CO

Bai Engineers entered a contract with TTG Engineers to conduct a water treatment pilot test for the Town of Fowler’s water treatment plant improvement project. The goal of the treatment is to effectively remove the nitrate from the drinking water supply source.
​
During the one-month long pilot test, BE recognized that chlorine oxidation followed by two-stage filtration was the best treatment process. 

​Completion Date: March 2016
Bai Engineers, LLC
Phone: (720) 474-0941
Email: xbai@bai-eng.com
Website: www.bai-eng.com
Main Office: 5350 DTC Pkwy, #206 Greenwood Village, CO 80111
DUNs#: 079586993
Cage Code: 78WY0
SBC Control ID: SBC_000857907
Copyright © 2014-2019 Bai Engineers, LLC, All Rights Reserved
  • Home
  • Who We Are
  • What We Do
  • Our Projects
  • Learn From Us
  • Contact Us