Bai Engineers
  • Home
  • Who We Are
  • Our Projects
  • Learn From Us
  • Contact Us

Cannon Air Force Base Sewer Lift Station Design

Clovis, NM

Bai Engineers is currently evaluating and modifying the aging sewer lift station at Cannon Air Force Base, New Mexico.

In order to reduce potential sewer overflow while minimizing the operation costs, modification and replacement of the existing sewer lift station are required. The existing sewer lift station has a capacity of 200 gallons per minute. The major sewer pumping facilities include two ABS submersible pumps, outlet pipes, emergency power generator, and local pump control panel. 
Bai Engineers, LLC
Phone: (720) 474-0941
Email: xbai@bai-eng.com
Website: www.bai-eng.com
Main Office: 5350 DTC Pkwy, #206 Greenwood Village, CO 80111
DUNs#: 079586993
Cage Code: 78WY0
SBC Control ID: SBC_000857907
Copyright © 2014-2019 Bai Engineers, LLC, All Rights Reserved
  • Home
  • Who We Are
  • Our Projects
  • Learn From Us
  • Contact Us